Details: excavation in earth work and disposing of all surplus excavated earth as directed with in a lead of 20 meters and lift upto 1.5 m disposed earth to be levelled and neatly dressed .in pick and jumper work 50% each(hpsr-2009-7020000) providing and laying cement concrete 1 :6:12 (1 cement:6sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centering and shuttering in foundation and plinth.(hpsr-2009-9160100) providing / laying cement concrete 1 : 5 : 10(1 cement : 5 sand : 10gradded stone agrigate 40 mm nomimnal size ) with 15 % plum concrete and curing complete, excluding cost of centering and shuttering in foundation and plinth .(hpsr-2009-9510000) providing form work with steel plates 3.15 mm thick welded with angle iron 30*30*5 as to give fare fininsh including centring shuttering, and proping etc. with wooden batten and ballies, hight of proping and centring below supporting floor to ceiling not eceeding 4 mtr. and removal of the same
Sector: Agriculture Dept