Details: excavation in foundations,trenches etc., in earth work, lift upto 1.50 mts. stacking the excavated soil not more than 3 mts. clear from the edge of the excavation & then returning the stacked soil in 15 cms. layers,when required into plinths sides of foundation etc.,consolidating each deposited layers by ramming & watering & then disposing of all surplus excavated earth as dierected within all leads & lifts as per entire satisfaction of engineer in charge. providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in foundation & plinth. providing & laying cement concrete1:1.5:3 (1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for reinforced concrete work in :-(i) foundation,footing,bases of columns and the like & mass concrete. (ii) wall (any thickness but not less than 0.10 mts.thickness)attached pillasters,buttr
Sector: Horticulture