The Irrigation Public Health Department Himachal Pradesh has published a tender for "Aug LIS Jukhala" on the 24 Sep 2025. This tender belongs to Retaining Wall Construction category. This tender is published in Hamirpur HP, Himachal Pradesh location. The vendors interested in this tender and related Retaining Wall Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | compound wall Tenders | retaining wall construction and repair Tenders
Related categories: Civil Foundation Tenders | Grouting service Tenders | Epoxy Grouting Tenders |
Irrigation Public Health Department Himachal Pradesh issued 56 tenders for Retaining Wall Construction last year
With, 7 floated just last month.
Tender Title | Aug LIS Jukhala |
---|---|
Tender Description | excavation in foundation & trenches etc. in earth work including all kinds of soil such as pick work jumper work, blasting soft and hard rock conglomirate up to all laeds and lifts stacked the excavated soil not more than 3mtrs. clear from the edge of excavation and then returning the stacked soil in trenches consolidating each deposited layer by ramming and watering and then desposing of all surplus excavated earth as directed by the engineer-in-charge. providing laying cement concrete 1:6:12 (1cement: 6sand: 12graded stone agreegate 40mm nominal size) curing complete excluding cost of form work in foundation and plinth including entire carriage of material up to all laeds and lift. providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to a fair finish including centering & shuttering and propping etc. with wooden battens and bllies, height of propping and centering below supporting floor to cielling not exceeding 4mtrs. removal of the same |
Comments | excavation in foundation & trenches etc. in earth work including all kinds of soil such as pick work jumper work, blasting soft and hard rock conglomirate up to all laeds and lifts stacked the excavated soil not more than 3mtrs. clear from the edge of excavation and then returning the stacked soil in trenches consolidating each deposited layer by ramming and watering and then desposing of all surplus excavated earth as directed by the engineer-in-charge. providing laying cement concrete 1:6:12 (1cement: 6sand: 12graded stone agreegate 40mm nominal size) curing complete excluding cost of form work in foundation and plinth including entire carriage of material up to all laeds and lift. providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to a fair finish including centering & shuttering and propping etc. with wooden battens and bllies, height of propping and centering below supporting floor to cielling not exceeding 4mtrs. removal of the same |
Published Date | |
---|---|
Due Date | 04 Oct 2025 00:00:00 |
Estimated Value | 0.0 |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |