The HPPWD has published a tender for "4386-93 dated 19-09-2025" on the 22 Sep 2025. This tender belongs to Drain Related Works category. This tender is published in Sirmaur, Himachal Pradesh location. The vendors interested in this tender and related Drain Related Works tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road and drain Tenders | drainage Tenders | drain renovation Tenders
Related categories: Drain Related Works Tenders |
In Sirmaur district, Himachal Pradesh, a total of 267 Drain Related Works tenders have been published, with 12 tenders released last month.
Tender Title | 4386-93 dated 19-09-2025 |
---|---|
Tender Description | earth work in excavation for structure in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, & blasting work (both in soft and hard rock) with chiseling / wedging out of rock( where blasting is prohibited) and their intermediate classification of soil. if water is met due to stream flow, seepage, rain and other causes, it shall be removed by suitable diversion, pumping and bailing out and dewatering, the excavation shall be kept dry wherever so required by the contractor at his own cost , including dressing of slopes and beds, setting out conforming to required lines, grades , side slopes as shown in the drawing and as per direction of engineer-in-charge and transportation of soil to road way and then disposing of surplus excavated earth in acquired width of road or on approved dumping sites including its stacking, levelling and dressin |
Comments | earth work in excavation for structure in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, & blasting work (both in soft and hard rock) with chiseling / wedging out of rock( where blasting is prohibited) and their intermediate classification of soil. if water is met due to stream flow, seepage, rain and other causes, it shall be removed by suitable diversion, pumping and bailing out and dewatering, the excavation shall be kept dry wherever so required by the contractor at his own cost , including dressing of slopes and beds, setting out conforming to required lines, grades , side slopes as shown in the drawing and as per direction of engineer-in-charge and transportation of soil to road way and then disposing of surplus excavated earth in acquired width of road or on approved dumping sites including its stacking, levelling and dressin |
Published Date | |
---|---|
Due Date | 01 Oct 2025 00:00:00 |
Estimated Value | 23.84 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |