Details: earth work in excavation by manually over areas (exceeding upto all depth, and width as well as all sqm on plan) including getting out and disposal of excavated earth upto all leads and lifts as directed by eic pick and jumper work. chipping of plaster/concrete upto cover: chipping: chipping of loose concrete from columns & all other concrete surfaces to expose sound concrete beneath using light chisel & hammer & also preparing concrete surface to receive further treatment, disposing the debris as directed. including carriage of material in all leads and lifts. supply and apply of rustremover passivator to remove rust from existing reinforcement, rust remover material, consumption: 0.2kg/m2/coat, density: 1.01 kg/l at 30 deg celcius including carriage of material in all leads and lifts. supply and apply a cement based polymer modified rebar corrosion protection system to existing reinforcement corrosion inhibitor, product requirements: carbonation resistance: 2mm of corrosion inhibi
Sector: Urban Authority