Details: excavation in foundations, trenches etc., in earth work, lift upto 1.50m stacking the excavated soil not more than 3m clear form the edge of the excavation and then returning the stacking soil in 15cm layers, when required in to plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20m stone soling properly hand packed filling and consolidation with proper road roller to the required grade and camber i/c spreading watering and rolling of binding material murum & earth etc. b above 100 mm thick providing and laying cement 1:6:12 ( 1 cement 6 sand 12 graded stone aggregate 40mm nominal size) and curring complete excluding cost of centring and shuttering in random rubble masonry/polygonal rubble masonary /polygonal rubble masonary (uncoursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1
Sector: Forest and Environment