Details: civil works of gph removal of slush/silt from fore bay and power channel of gph, by manualy carriage and lift through main hole of power channel in between distance of about 300 to 350 mtrs in all kinds of soil including saturated soil and disposal of the same up to required lead as directed by the engineer - in-charge
Sector: Distribution