Details: construction of hume pipe culvert, providing & laying kharanja stone soling, construction of v-shape drainage line complete in all respect. excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per technical specification clause 1603.1 earthwork in excavation for structures as per as drawings and technical specifications clause 305.1 including seeting out, construction of shoring and brancing, removal of stums and other deleterious material and disposal upto a lead of 50m, dessing of sides, and bottom and backfilling in treanches with excavated suitable material. providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203. p.c.c nominal mix 1:4:8 (25 mm aggregates) providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
Sector: Forest and Environment