Details: demolishing cement concrete manually/ by mechanical means including disposal of material within all lead & lift as per direction of engineer - in - charge. a) nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) as per entire satisfaction and direction of engineer -in-charge including carriage of material within all lead and lift. earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth within all lead and lift, as directed by engineer-in-charge:a) all kinds of soil as per entire satisfaction and direction of engineer -in-charge including carriage of material within all lead and lift. earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, within all lead & lift as directed by engineer-in-charge. a) all
Sector: Science University