Details: earth work in excavation by mechanical means(hydraulic excavator) / manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kind of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level.1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of material in all leads & lifts. centering and shuttering including strutting, propping etc. and removal of form for (i) suspended floors, roofs, landings, balconies and access platform. including carriage of material in all leads & lifts. walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. providing and laying in position specified grade of re
Sector: Urban Authority