Details: providing and fixing double scaffolding system (cup lock type) on the exterior and inner side, up to 90 feet height made with 40 mm dia m.s. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with m.s. tubes, m.s. tube challies, m.s. clamps and m.s. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .the scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of engineer in-charge .the elevational area of the scaffolding shall be measured for payment purpose. chipping of plaster/concrete upto cover: chipping of plaster/concrete upto cover only for making better bonding in between old and new concrete including tapering all edges upto 25mm
Sector: Urban Authority