Details: providing, laying, spreading and compacting stone aggregates of specific sizes to water bond macadom specification including spreading in uniform thickness,hand packing, rolling with smooth wheel roller 80/100 kn in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill up the interstices of course aggregate, watering and compacting to the required dencity grading-iii as per technical specification clause 405.using stone aggregate 45 mm to 22.40 mm including hauling of material in all leads and lifts as per the entire satisfaction and direction of the engineer-in-charge. providing and applying primer coat with bitumen emulsion (ss-i) on prepared surface of granular base including cleaning the road surface with hydralic broom and spraying primer at ther ate 1.05 kg (one point zero five kilogramme) per square metre using mechnical means as per technical specifictions clause 502 including hauling of material in all leads and lifts as per
Sector: PWD