Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal ofexcavated earth lead upto 50 m and lift upto 1.5 m, including carriage of material in all leads & lifts.: asdirected by engineer-in-charge.all kind of soil providing and laying cement concrete 1 : 4 : 8 (1 cement :4 sand :8 graded stone aggregate 20 mm nominal size) and curing complete (excluding cost of form work) in foundation and plinth including carriage of material in all leads & lifts. centering and shuttering including strutting, propping etc. and removal of form for upto any height/ depth including carriage of material in all leads & lifts. retaining walls return walls, wall & any( thickness) including attached pillasters, buttresses, plinth and string course fillets, kerb and steps suspended floors, roofs, landings, balconies and access platform. providing and laying in posit
Sector: Urban Authority