Details: cutting in earth work by mechanical mean in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the engineer in-charge at site, according to the hp.pwd norms. excavation work of all kind of soil by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils within all lead and lifts as per the diretion of engineer in charge at site. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and