Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift all leads & lifts, including getting out the excavated soil and disposal of surplus excavated soil as directed, by engineer in charge in all kind of soil. supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of engineer-in-charge. removing the stagnant sewage water including sludge from the existing old septic tank compartments which are to be converted in bionest capsules, using suction pump mechanism on the tanker truck, transporting and disposal at suitable site as directed. breaking of rcc slab 150 mm thk. of existing old septic tank compartments to be converted to bionest capsules, by hydraulic / mechanical means, seperating steel, lev
Sector: Urban Authority