Description: Development of Leishang Hiden Eastern Side Phase I Name of Work Development of Leishang Hiden Eastern side phase I
Details: Construction of Pathway Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan) including getting out and disposal of excavated earth,lead upto 50m and lift upto 1.5m,as directed by the Engineer -in- Charge. a) All kinds of soil. Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm.in depth, consolidating each deposited layer by ramming and watering lead upto 50 metres lift upto 1.5 metre. Providing, laying and compacting Granular base/sub-base with naturally occuring Sand Gravel Material free from organic ore other deleterious constituent spreading with Motor Grader and compacted by rolling with power roller of 8 to 10 tonne capacity in layers not exceeding 150mm (spread thickness). Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upt
Sector: Planning