Details: (sh:- construction of weir)supplying and fitting bamboo spur 5 cm diameter of good quality bamboo at an interval of 4 cm between two bamboos and 1.2 m to 1.5 m high above the ground level 1.2 m inside the ground as directed by the engineer-in-charge.earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers and rolling every third and topmost layer with power roller of minimum 8 tonne and dressing up embankment for roads, flood-banks, marginal banks and guide bankd and filling up ground depression, lift upto 1.5 metre.earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5 metres including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 metres.extra for every additional lift of 1.5 metres or part thereof in hard/dense soil.filling availabl
Sector: Irrigation