Details: earthwork in excavation in foundation trenches etc. not exceeding 2 meters depth including dressing of bottom and sides of trenches and subsequent filling and compaction in 15cm layers as in column foundations, fence posts, etc. and disposal of all surplus soil as directed within a lead of 30 metres.a) oridinary soil providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering - all work upto plinth level:a) 1:3:6(1 cement :3 course sand :6 stone aggregate 20mm nominal size) providing and laying in position reinforced cement concrete excluding cost of centering and shuttering , finishing and reinforcement in - a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) reinforced cement concrete work in walls including attached pillasters, columns, pillers, posts, piers, abutments, return walls, retaining walls, struts, buttresses, string or lacing courses, fillets etc. upto floor five level excluding cost
Sector: Buildings