Details: dismantling gs sheet roofing including ridges, hips, valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc. complete as per direction of the engineer- in-charge dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of to the dumping ground with all leads and lifts etc. complete as per direction of the engineer- in-charge. demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50 m lead etc complete as per direction of the engineer- in-charge:- nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : a) of area 3 sqm and below. providing wood work
Sector: Police and Internal Security