Details: a-road work removing all types of hume pipes.removing all types of hume pipes and stacking within a lead of 1000 m excluding earthwork and dismantling of masonry works as per mord technical specification clause 202.( b ) above 600 mm to 900 mm dia hume pipe dismantling brick/tile work as per mord technical specification no. 202. dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all lift and upto a lead of 1000 m as per mord technical specification clause 202.b) cement mortar construction of embankment with material obtained from borrow pitsconstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with
Sector: Buildings