Description: Construction of Bishalgarh Town Girls High School at Bishalgarh Sepahijala Tripura Phase II SH Building portion including water supply and sanitation Name of Work Construction of Bishalgarh Town Girl s High School at Bishalgarh Sepahijala Tripura Phase II S H Building portion including water supply and sanitation
Details: (A) S.H. EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.-All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil Supplying and filling in plinth, under floor, foundations etc. With sand (fine) from local quarry with all lifts including spreading in horizontal lay
Sector: Buildings