Details: construction of embankment with material obtained fromroadway cuttingconstruction of embankment with approved materialsdeposited at site from roadway cutting and excavationfrom drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per mord technical specification clause 301.5. a. for spreading beyond 100 m providing & placing gunny/polythene (of minimum wall thickness of 500 micron) bags filled with sand ( of minimum quantity of 0.034 ) & properly manually stitched to avoid any leakage of sand as per specification. single bamboo palasiding/walling of whole 2nd classbamboo (jati or bethua) 65 to 75 mm dia and closelypacked & driven @ 150 mm c/c including fitting fixing withhalf bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apartlongitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and mord technica specification clause 1302.5.
Sector: PWD