Details: a. without dewatering. earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. a) ordinary soil i) upto 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200 i) sand filling providing concrete for plain concrete ( using jhama brick aggregate ) in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centring, shuttering, staging etc. but excluding reinf
Sector: Buildings