Details: sub head - isite clearance clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per mord technical specification clause 201.by manual means sub head - iiprotection work ( retaining wall & brick drain ) earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.ordinary soilupto 3 m depth filling in foundation trenches as per drawing & mord technical specification clause 305.3.9, 1200. sand filling providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)p.c.c grad
Sector: Buildings