Description: FDR of approach of Halaicherra Steel Bridge and Halairpar RCC bridge during the year 2024 25 SH protection work soling etc Name of Work FDR of approach of Halaicherra Steel Bridge and Halairpar RCC bridge during the year 2024 25 SH protection work soling etc
Details: Excavation for StructuresWithout dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. Ordinary Soil(i) Upto 3 m depth Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.(i) Sand filling Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).P.C.C grade M 10(i) Nominal mix 1:3:6 Construction of toe walls for protection of slopes as per Drawing and MoRD technical specifications Clause 1302.5 (including centering, shuttering staging etc. but excluding reinforc
Sector: Buildings