Description: Constn of road side pucca drain GSB WBM 2 WBM 3 and carpeting work Name of Work FDR Mtc of Sakaibari road during the year 2024 25 SH Constn of road side pucca drain GSB WBM 2 WBM 3 carpeting work
Details: Road side Pucca DrainsConstruction of road side pucca drain with M10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and MoRD Technical Specification Clause 307, 1606. Excavated material to be used in embankment at site. (including centering, shuttering, etc. but excluding reinforcement) U shaped drain (top clear width 600 mm, bottom clear width 600 mm and clear depth of 600 mm)In Ordinary Soil Granular Sub-base with Well Graded Material (Table 400.1) using Jhama Brick AggregateBy Mix in Place MethodConstruction of granular sub-base by providing well graded material (Jhama Brick Aggregate, Grading-I, as per Table 400.1, spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Te
Sector: Buildings