Details: design, engineering, manufacturing, shop inspection and testing at manufacturer’s works,packing and forwarding, delivery at site, unloading, storage and handling at site, design of civil foundation and supervision of civil construction job, of complete package (including equipments, piping, electrical and instrumentation items),mechanical completion, commissioning and carrying out acceptance test for effluent treatment plant(etp)along with all the accessories including training for purchaser’s personnel , supply of start- up and commissioning spares and maintenance tools and tackles as called for in the specification and mr.major components of the etp package are given below-1) primary treatment system including screening, oil & grease trap, equalization tank, pumps with motors, valves, piping, instruments and other accessories.2) mbr system including pumps with motors, chemical dosing system, valves, piping, instruments, treated water storage tank, cip system and other accessories.3
Sector: Medical and Health