Description: Construction of Platform with approach Road for the Installation of Sewage Treatment Plant STP Puducherry Distilleries Limited Campus Puducherry Name of Work Construction of platform with approach road for errection of STP in the Puducherry Distilleries Limited Campus Puducherry
Details: Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil Supplying and filling with gravel (excluding rock) in trenches , plinth, sides of foundations etc . In layers not exceeding 20 cm in depth onsolidating each deposited layers by ramming and watering etc .complete including all lead and lift Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement :
Sector: Industries and Factories