Details: removing and disposal of agayathamarai and other water plants from the water bodies like rivers, lakes, ponds and channels etc., the rate shall includes all charges for tools and plants and labour required for removal of agayathamarai and disposal within a initial lead of 50m and lift upto 1.50m as directed by the engineer in charges desilting the canal by removing silt, slush and debries from the bed of the drain removing the grass , bushes etc., complete in unhygenic and foul condition including disposal of the same within an average lead of 1km without polluting the environment by mechanical means. earth work in excavation by mechanical means (hydraulic excavators )/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and for all lift as per direction of engineer-in-charge by in charge - all kinds of soil earth work in excavation by mechanical means (hydraulic excavator)/manu
Sector: District Administration