Details: earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavatedsoil as per direction of engineer-in-charge , within a lead of 50m - all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plnith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:2:4 (1 cement : 2 fine aggregate : 4 gradedstone aggregate 20mm nominal size) providing and laying non
Sector: District Administration