Details: arboriculture/landscaping work at dev lok colony 02 parks earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan), including disposal of xcavated earth, lead up to 50 m and lift up to 1.5 m,as per directions of engineer in incharge.2.6.1 all kinds of soil surface dressing of the ground including removing vegetation and inequalitiesnot exceeding 15 cm deep and disposal of , lead up to 50m and lift up to 1.5 m.2.28.1 all kinds of soil supplying and stacking of good earth at site including royalty and carriage upto 5 k m leadcomplete (earth measured in stacks will be reduced by 20% for payment). preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching theexcavated base to a further depth of 30 cm, refilling the excavated earth after breaking clodsand mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth afterreduction by 20%
Sector: Urban Authority