Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil random rubble stone masonry laid dry, in walls, retaining walls, etc. including supply of all material, labour, t&p and royaltiies etc. complete as per drawing and technical specifications clauses 702, 704, 1202 & 1203 of mord specifiction providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 p.c.c. 1:2:4 steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. hot finished we
Sector: RDPR