The Bazpur Cooperative Sugar Factory Limited has published a tender for "Job Work For 1500KW, 2000KW, 2500KW Power Turbine" on the 20 May 2024. This tender belongs to Sugar Mill Machinery Installation category. This tender is published in Udham Singh Nagar, Uttarakhand location. The vendors interested in this tender and related Sugar Mill Machinery Installation tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: sugar milling machinery Tenders | tools and general machinery Tenders | machines Tenders
Related categories: Cooling machine Tenders | Filling Machinery Components Tenders | Liquid filling machine Tenders |
Bazpur Cooperative Sugar Factory Limited issued 3 tenders for Sugar Mill Machinery Installation last year
With, 2 floated just last month.
| Tender Title | Job Work For 1500KW, 2000KW, 2500KW Power Turbine |
|---|---|
| Tender Description | repairing of 2500 kw. power turbine alternator m/s jyoti make. (i) driving end alternator bearing pedestal bearing and oil seal bearing boring repairing by welding and final boring to be done. (ii) driven end alternator bearing pedestal bearing and oil seal bearing boring to be repaired and final boring to be completed.(iii) distance support of pedestal of driving end and driven end to be machined.(iv) alternator half coupling existing to be removed and new coupling to be fitted. (v) alternator journal to be polished for both sides (driven end and driving end) and dimention to be maintained 203.2 mm. (vi) alternator shaft to be balanced. (vii) all fastener for bearing pedestal to be replaced. (viii) gear shaft existing gear hub coupling to be removed and new gear hub coupling to be fitted(ix) gear to be balanced after fitting the new gear coupling. repairing work of 2000 kw. power turbine italian make |
| Comments | repairing of 2500 kw. power turbine alternator m/s jyoti make. (i) driving end alternator bearing pedestal bearing and oil seal bearing boring repairing by welding and final boring to be done. (ii) driven end alternator bearing pedestal bearing and oil seal bearing boring to be repaired and final boring to be completed.(iii) distance support of pedestal of driving end and driven end to be machined.(iv) alternator half coupling existing to be removed and new coupling to be fitted. (v) alternator journal to be polished for both sides (driven end and driving end) and dimention to be maintained 203.2 mm. (vi) alternator shaft to be balanced. (vii) all fastener for bearing pedestal to be replaced. (viii) gear shaft existing gear hub coupling to be removed and new gear hub coupling to be fitted(ix) gear to be balanced after fitting the new gear coupling. repairing work of 2000 kw. power turbine italian make |
| Published Date | |
|---|---|
| Due Date | 05 Jun 2024 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |