Details: earth work in excavation in trenches for foundation and for pipes cables etc. in ordinary soil including fitup to 1.5m and dressing of sides and ramming bottoms and disposal of surplus excavated earth as directed by the engineer with in a lead of 50m. extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials providing and laying in position cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-iii): 6 graded stoneaggregate 40 mm nominal size) centering shuttering including strutting, propping etc. and removal of form work foundations, footings, bases of columns, etc. for mass concrete providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii): 3 graded stoneaggregate 20 mm nominal size) brick work with common burnt clay f.p.s. (non modular) bricks
Sector: Irrigation