Details: excavation for structure for ordinay soil by manual means depth upto 3 mtr. excavation for structure for ordinary rock (not requiring blasting) by manual means depth upto 3 mtr. providing and laying of wire crates 3.00x1.50x1.50 m. in size with a 8 gauge bwg gi wire conforming to is: 280 & is:4826 in 150mm x150 mm mesh laid with stone boulders weighing not less than 25 kg each. concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and t&p etc. required for proper completion of the work.(based on pwd specifications) random rubble masonary laid dry in wall,retaining wall, parapets, scupper etc. including supply of all materials,labour, t&p royality etc. random rubble stone masonry laid in 1:5 cement and sand mortar, in walls, retaining walls, parapets, scuppers, etc. i/c supply of all material, labour, t&p and royaltiies etc. providing concrete for plain/reinforced concrete in open founda
Sector: Irrigation