Description: eTender for godown No 1B 2B 3A 3B floor height c c and shutter height increase at Gadarpur for 2023 24 Name of Work godown No 1B 2B 3A 3B floor height c c and shutter height increase at Gadarpur
Details: Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5m. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) 50 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix:2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @2 liter per 50 kg of cement or as per manufacturer’s specifications, this includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. Providing and fixing g
Sector: Logistics and warehouses