The PTCUL has published a tender for "Checking the online health monitoring of CTs, PTs, LAs and work of residual life assessment (Detailed assessment by diagnostic and analysis for incipient fault perdiction) of power transformer installed at 132KV S/s, Bazpur and 132KV S/s, Kashipur" on the 12 Dec 2025. This tender belongs to Electrical Substation category. This tender is published in Nainital, Uttarakhand location. The vendors interested in this tender and related Electrical Substation tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: power line substation Tenders | all power line work Tenders | electric power lines Tenders
Related categories: Airport Runway Tenders | Airport Runway Repair Tenders | Road Paving Tenders |
Uttarakhand has published 1,569 tenders in Electrical Substation in the last financial year.
Out of these, 74 were published last month.
| Tender Title | Checking the online health monitoring of CTs, PTs, LAs and work of residual life assessment (Detailed assessment by diagnostic and analysis for incipient fault perdiction) of power transformer installed at 132KV S/s, Bazpur and 132KV S/s, Kashipur |
|---|---|
| Tender Description | at 132kv s/s, kashipur the following tests are to be carried out for "work of residual life assessment test (detailed assessment by diagnostics & analysis for incipient fault prediction) of 40 mva power transformers" i) vibration measurement test.ii) noise measurement.iii) thermographic measurementiv) short circuit impedence testv) online partial discharge measurement testvi) magnetic balance testvii) winding resistance at all tapsviii) insulation resistance measurement.ix) magnetizising current on each tapx) frequency response on stray load (frsl)xi) leakage reacactance & impedende measurement. xii) capacitance & tan delta of bushings & windings xiii) vector group testxiv) turns ratio test xiv) sfra work of opening and re-jumpering of both hv & lv side of transformers jumpers (6 nos.) including opening & reconnection of earthing of bo |
| Comments | at 132kv s/s, kashipur the following tests are to be carried out for "work of residual life assessment test (detailed assessment by diagnostics & analysis for incipient fault prediction) of 40 mva power transformers" i) vibration measurement test.ii) noise measurement.iii) thermographic measurementiv) short circuit impedence testv) online partial discharge measurement testvi) magnetic balance testvii) winding resistance at all tapsviii) insulation resistance measurement.ix) magnetizising current on each tapx) frequency response on stray load (frsl)xi) leakage reacactance & impedende measurement. xii) capacitance & tan delta of bushings & windings xiii) vector group testxiv) turns ratio test xiv) sfra work of opening and re-jumpering of both hv & lv side of transformers jumpers (6 nos.) including opening & reconnection of earthing of bo |