Description: CONSTRUCTION OF GOVT POLYTECHNIC BUILDING PHASE II WORK AT POKHRI BLOCK POKHRI DISTT CHAMOLI Name of Work CONSTRUCTION OF GOVT POLYTECHNIC BUILDING PHASE II WORK AT POKHRI BLOCK POKHRI DISTT CHAMOLI
Details: Excavation in Hilly Areas in Soil by mechanical means Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.Ordinary or hard rock Excavation in foundation for retaining & walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. Random Rubble Stone Masonry laid Dry, in walls, retaining walls, etc.including supply of all material, labour, T&P and royaltiies etc. Plain/reinforced cement concrete in substructure complete as per drawings and technical spe
Sector: Water supply and Sewerage