Description: Drilling of Tubewell in AwasVikas Campus Under Kashipur Urban Water Supply Scheme Name of Work Drilling of Tubewell in AwasVikas Campus UnderKashipur Urban Water Supply Scheme
Details: Construction of 300 mm dia 220 mt deep Tubewell Transportation of suitable truck mounted rig machine, aircompress or, OPunit, camp equi pageconnected T&P and necessary accessories ,casing pipe,tube well assembly, housingpipeetc .includingloading, unloading, up to site of work etc.complete in all respect as per direction of Engineerin charge, required for drillingand development oftubewell: and levelling of rig machine and camp equipage at site of work drilling of 550mm dia bore by heavy duty direct rotary rig machine in aluvial boulders pebbles rocky stone sticy clay etc from ground lavel up to entire depth for 300 mm dia linear assembly. Preparing and lowering of TW assembly (starting fron gound level to the reqyured depth including cutting welding as requred at site complete with T&P requred (i) fixing of 300 mm dia ball with nut and u bolt. lowering of 300 mm dia MSERW housing pipe (Plane and sloted pipe) as requred fixing of 300 mm dia thick tuebell cap fixing of 300 mm dia M
Sector: Water supply and Sewerage