Details: supply, installtion & commossioning of spm analyzer with tuv. as per specifications, the system should have the below features as desired by cpcb.a) the spm analyzer should have continuous quality check for zero and spa point, prferably without human intervention to ensure continuous daya validity and credibility. (please refer guidelines for continuous emission monitoring system july 2017 page 8/100)b) the system should have feature of automatic range setup.c) the system does not required manual adjustment and should operate without any human intervention.d) the system should have autotic drift compensation.e) the system doen not have optical windows to be cleaned.f) the system should not required any alignment for smooth operation.g) the system doen not have any effect of vibrations on the system accuracy and readings.h) the system should have tuv with qal (en15267 parts 1 to 3) with appropriate certification range as per cpcb guidelines.measurement principle: inductive electrific
Sector: Sugar