Details: dismantling of cement concrete pavements as per technical specification clause 202. dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately sor mord 2-15 excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposite layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m : 2.13.1.2 pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia dsr 2.13.1.2 granular sub-base/base/surface course with local materials (table 400.13) by mix in pl
Sector: Rural Misc