The PWD UK has published a tender for "Work Construction of Bridge on Aglad river in Km 1 of satagard bend to Gherachak Dangasari Ghuttu motor road in block Jaunpur Constituency Dhanaulti District, T.G. under State Sector (First Phase work, Design Drawing, Vetting, DPR preparation etc" on the 24 Mar 2025. This tender belongs to Road Consultancy category. This tender is published in Tehri Garhwal, Uttarakhand location. The vendors interested in this tender and related Road Consultancy tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: highway consultancy services Tenders | civil consultancy Tenders | dam engineering Tenders
Related categories: Technical Drawing Tenders | AutoCAD Drawing Tenders | Architectural and PMC Tenders |
Around 2953 tenders were floated in Uttarakhand in the past month with major spending on water supply work Tenders, road construction Tenders, vehicle hiring Tenders
| Tender Title | Work Construction of Bridge on Aglad river in Km 1 of satagard bend to Gherachak Dangasari Ghuttu motor road in block Jaunpur Constituency Dhanaulti District, T.G. under State Sector (First Phase work, Design Drawing, Vetting, DPR preparation etc |
|---|---|
| Tender Description | feasibility study (14%) geological investigation and submission of report. hydrological investigation, analysis and design including preparation and submission of design report. topographic survey, traffic survey (if required) and preparation of 4 no. longitudinal section & cross section for site selection and preparation of final gad after site selection and other drawings s required. geotechnical investigation and design of foundation and substructure including vetting from reputed technical institute or agency finalized by the client (50%) geotechnical investigation, carrying out the required sub soil exploration and laboratory tests including preparation and submission of report. preparation of design and drawings of foundation and sub structure including submission of design report and drawings in hard and soft copy formats. design of superstructure and bearings including vetting from reputed technical institute or agency finalized by the client (30%) preparation of design and d |
| Comments | feasibility study (14%) geological investigation and submission of report. hydrological investigation, analysis and design including preparation and submission of design report. topographic survey, traffic survey (if required) and preparation of 4 no. longitudinal section & cross section for site selection and preparation of final gad after site selection and other drawings s required. geotechnical investigation and design of foundation and substructure including vetting from reputed technical institute or agency finalized by the client (50%) geotechnical investigation, carrying out the required sub soil exploration and laboratory tests including preparation and submission of report. preparation of design and drawings of foundation and sub structure including submission of design report and drawings in hard and soft copy formats. design of superstructure and bearings including vetting from reputed technical institute or agency finalized by the client (30%) preparation of design and d |
| Published Date | |
|---|---|
| Due Date | 19 Apr 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |