Details: dsr item- 2.6.1earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil dsr horticulture 2.2supplying and stacking of good earth at site i/c royalty and carriage up to 1 km (earth measured in stacks will be reduced by 20% for payment). dsr item- 2.3supplying and stacking sludge at site including royalty and carriage up to 1 km (sludge measured in stacks will be reduced by 8% for payment) dsr item- 2.4.1supplying and stacking at site dump manure from approved source, including carriage up to 1 km (manure measured in stacks will be reduced by 8% for payment) : screened through sieve of i.s. designation 20 mm dsr item- 2.5rough dressing the trenched ground including breaking clods dsr item- 2.6uprooting weeds from the trenched area after 10 to 15
Sector: Water supply and Sewerage