Details: preliminary and detailed surveying, construction of level pillars, preparation of l-section, plan, x-sections soil testing, trafiic surveying, topographical survey, detailed reconnaissance, field investigation, topographical survey, traffic survey and axle load survey, inventory and condition survey, pavement and subgrade investigations, identification of intersections, preparing the design and working drawings of the highway project etc. for consultancy work for preparation of detailed dpr for conversion of two lane to four lane of nagla-kichha state highway no.- 44 from km 0.000 to 12.500 and km 15.000 to 17.700 complete as per tor (all rates are including gst)..
Sector: PWD