Details: dismantling of cement concrete pavement(dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal ofdismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materialsseparately) dismantling brick/tile workdismantling of existing structures like culverts, bridges, retaining walls and other structurescomprising of brick masonry, including disposal of unserviceable material and stacking theserviceable material with all lift and lead of 1000 m as per technical specification clause 202cement mortar excavation in foundation for retaining, walls etc, in all types of soils and rocks including all lead, l technical specifications clause 305.1 of mord specifiction providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and technical spec
Sector: Urban Authority