Details: by mix in place methodconstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401 etc complete as per instruction by engineer-in-charge concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion1:4:8 in foundations and floors including supply of all material, labour and t&p etc.required for proper completion of the work. as per drawings and technicalspecifications clause 802, 803, 1202 & 1203 etc complete as per instruction by engineer-in-charge cement concrete (pcc m-30) pavement:- construction of un-reinforced, cement concrete pavement, thickness as per design,over a prepeared sub base with 43 grade cement or any other type pcc grade m30, coarse and fine aggregates conforming to is: 383, maximum size of coarseag
Sector: PWD