Details: civil works earth work in excavation of foundation trenches in hard soil with initial lead and lift except sheet rock and boulders (requiring blasting) including dressing and leveling the bed upto the required depth and depositing the excavated materials away form the site with all leads and lifts. t & p shoring and shuttering if required etc. complete as directed by engineer- in charge. supplying and filling in foundation and ditches with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance, loading and unloading , royalties and taxes of all materials and cost of all labour, sundries. t & p required for the work etc complete in all respect as per direction of engineer incharge. single under reamed pile foundation of 300 mm dia and 6m long with r.c.c (1:1.5:3) using 12mm. size black hard granite (hand broken ) stone chips including cost of boring but excluding cost of m.s/tor steel and labour charges for cutting,bending
Sector: Education Misc