Details: civil works foundation and plinth earth work earth work in excavation of foundation trenches in ordinary soil except sheet rock and boulders (requiring blasting) including dressing and leveling the bed upto the required depth and depositing the excavated materials away form the site with all leads and lifts. t & p shoring and shuttering if required etc. complete as directed by engineer- in charge. sand filling supplying and filling in foundation and ditches with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance, loading and unloading , royalties and taxes of all materials and cost of all labour, sundries. t & p required for the work etc complete in all respect as per direction of engineer incharge. concrete work p.c.c (1:3:6) providing & laying plain cement concrete 1:3:6( 1 cement 4 coarse and 8 graded stone aggregate fo 40 mm nominal size) in foundation and pinth including cost of hoisting, lowering laying conc
Sector: Education Misc