Details: (main jetty & finger jety) - setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (400 mm dia pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the engineer-in-charge. (approch jetty & waiting hall)- positioning and setting upon and/or shifting and setting up piling equipments required for piling work at each piling locations for (400mm dia) as shown in the drawing and or as directed including all labour, materials, fuel, tools, equipments etc., complete (main jetty,finger jety,approch jetty & waiting hall)-supplying and fabricating m.s.liners confirming to is specifications of sail of 6mm thickness m.s plates for required length with m.s. shoes of 1.0m height using 6mm thick m.s. plates for bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling and
Sector: Harbor