Details: dismantling of c.c pavement by mechanical means using pneumatic tools,breaking into pieces ,disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately complete including all costs of coveyance ,t&p as per the instructions of the engineer-in-charge excavation for road works in all kinds of soil using hydraullic excavator including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including dewatering if necessary etc complete as per clause 304 of technical specification for road and bridge works (morth 5th revision) and as directed by the engineer in charge loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as gi
Sector: PWD